This began as a simple interior remodel. We were gutting entire interior and updating fixtures. We received a permit for roll off dumpster and got started. Our contractor said, we have to replace the roof, if we are replacing the entire roof, might as well raise the side walls to 10' height and modernize the roof pitch. We were out of town and excited. He got busy, tearing off the roof and all trusses. He then begins tearing down all exterior studs to replace with 10' studs for side walls. He peels all exterior walls away, builds back with 10' framing and begins to close in the exterior. We get a call and we are stopped as we ONLY HAD A DUMPSTER permit, not full remodel. We get back into town and realize, YES, we got ahead of ourselves. We need to adjust our permit for a larger scale of project. THAT IS WHEN we emailed Safebuilt the general change of scale/ scope of remodel. We also call into city hall and spoke with Melissa asking what we need to do to get back on track. We are instructed to pull permit application off of EO website, fill it in and submit it.
JUNE 19, 2026- EMAIL SENT TO SAFEBUILT is CLEARLY EXPLAINING SCOPE of project has changed. See email. JUNE 19, 2026-
BUILDING PERMIT APPLICATION filled out and CLEARLY STATES with same language the scope of project and current demolished state of slab with few standing walls.
SEE DATE STAMPED PHOTOS OF JOB SITE STATUS AND DEGREE OF DEMO PRIOR TO PERMIT APPROVAL.
The building specs, artist rendering, survey and required energy specs, etc were all submitted to Safebuilt for review and the City of Enchanted Oaks.
JULY 6, 2026- Safebuilt calls our contractor that evening "Your plans have been approved you can get started in the morning."
SAFEBUILT STAMPS OUR SURVEY AND APPROVES OUR PERMIT 7/7/2026.
JULY 7, 2026- Contractor has guys there at crack of dawn getting started. BOTH JUDY KING and KIM COCHRAN are in front of the home at 8:59a.m. Judy King is yelling that there must be a permit displayed on property and they cannot work without that. SHE WAS FILMING JOB SITE WITH HER PHONE. Judy is keenly exposed and aware of the condition of this property WHEN THE PERMIT WAS APPROVED ON THAT DAY, JULY 7, 2026. Ed Bromley immediately arrived, explains that he is getting it from the office as soon as it opens. Ed and contractor wait for Tim Johnson to arrive, they walk the job site together, it has many new framed walls up, some original interior framed walls and new exterior sheathing is installed, they drive to town hall together, Tim Johnson as THE BUILDING OFFICIAL FOR ENCHANTED OAKS signs the building permit #2557 and Ed takes it back to post at the job site.
THE PERMIT IS APPROVED AS FOLLOWS DUE TO THE MID-CONSTRUCTION STATE this job was in.
*NEW BUILD/ REMODEL (OVER 50% REMODEL) ON EXISTING SLAB*
SEE IMAGE OF PERMIT SIGNED BY TIM JOHNSON
This language was filled in by either Safebuilt or the City of Ench Oaks, we signed what was offered and were excited to get back to remodel.
The construction crew returns the following day and continues to build through 7/29/2026.
JULY 29, 2026. WE ARE TOLD BY OUR CONTRACTOR THAT JUDY KING IS DELIVERING A STOP ORDER WITH OUR POLICE CHIEF AND TELLING EVERYONE TO CEASE AND DESIST, LEAVE THE SITE.
We are also notified by email sent from the secretary of Enchanted Oaks email notice of STOP ORDER where it CC our contractor, Judy King, Kim Cochran, Bart (Safebuilt) and Charlie (Safebuilt). WE DO NOT SEE TIM JOHNSON NAME ANYWHERE ON EMAIL. NEW EMAIL ADDRESS SHOWS UP AS BUILDING OFFICIAL <building@enchantedoaks.org>
We have no idea why Tim Johnson is not CC or who this new email is.
Ed calls and is told we have to sit in a zoom hearing with Safebuilt. No further explanation is offered specifically other than, " Stop Work Order is issued based on the project exceeding the scope that was submitted to obtain permit."
SCOPE OF PROJECT CLEARLY EXPLAINED AND NEW REPLACEMENT CONSTRUCTION ALREADY WELL UNDERWAY IN JUNE when they stopped us and asked us to submit request for a modified permit. We then submitted enough for them to turn around and APPROVE ON JULY 7.. IF THEY ARE DISPPROVING THE DEGREE OF DEMO DONE IN JUNE, THAT WOULD BE THE TIME TO RAISE THAT ISSUE, DO NOT APPROVE A PERMIT, ALLOW THREE WEEKS OF CONSTRUCTION AND THEN STOP FOR THE REASON YOU SHOULD HAVE USED IF YOU LOOKED AT THE PROPERTY, VISITED THE SITE, IN JUNE WHEN WE APPLIED FOR PERMIT. WE SIGNED THEIR LANGUAGE ON 7/7/2026 AS TO STYLE OF PERMIT. THEY LABELED IT NEW BUILD/ REMODEL (OVER 50% REMODEL) ON EXISTING SLAB.
TIM JOHNSON VISITED THE SITE ON JULY 7, 2026 AND SAW THE DEGREE OF CONSTRUCTION UNDERWAY ON THAT DAY. SEE PHOTOS WITH DATE STAMPS. HE SIGNED AND APPROVED THE PERMIT.
We wait for our zoom hearing.
AUG. 6, 2026- We participate in a zoom hearing that has Judy King, Kim Cochran, Melissa Kreindel and Safebuilt representatives.
WE DO NOT KNOW WHY TIM JOHNSON THE BUILDING OFFICIAL WHO IS SIGNATURE APPROVING OUR PROJECT IS NOT PART OF THIS ZOOM HEARING. WE DID NOT KNOW OUR STOP ORDER HAD BEEN KEPT A SECRET FROM THE BUILDING OFFICIAL TIM JOHNSON, FROM OTHER COUNCIL MEMBERS. WE NOW SIT AND DEFEND OUR PLAN PACKET WITH TWO WOMEN WHO WERE NOT INVOLVED IN ANY OF THIS FROM THE BEGINNING. THEY SIMPLY BANTER ABOUT " exceeding scope" never giving any specifics. WHEN ED ASKS SPECIFICIALLY - they say "You tore it all down" "You have to start over with a New Build Permit" We say, that was already like that when we applied for this and were approved. How is any of that beyond scope emailed 6/19??? They then express that the structure is over the build line towards the street by about 2 feet. We reemphasize, THE PERMIT IS BUILDING ON EXISTING SLAB, THAT IS EXACTLY THE FOOTINGS WHERE THE SLAB HAS BEEN FOR YEARS. WE SUBMITTED THE SURVEY SHOWING THAT, SAFEBUILT REVIEWED IT, STAMPED IT AND SIGNED OFF.
HOW IS IT A PROBLEM THREE WEEKS LATER??
Ed than pushes for what their credentials are, certification to establish anything construction related that we have exceeded scope for because it became VERY APPARENT THAT SAFEBUILT DID NOT SHUT US DOWN, THE CITY INITIATED THE EMAIL THAT WENT OUT TO US AND SAFEBUILT SHUTTING US DOWN. Judy and Kim had no answer to credentials or licensing to inspect construction or plans. The hearing became more of an argument as we asked Safebuilt to identify if they needed more detail info, etc we are happy to provide, but Judy and Kim kept saying, "NO, NO, NO, THEY MUST RESUBMIT FOR A NEW PERMIT and START OVER" SEE THE FULL AUDIO CLIP OF THIS HEARING and HOW YOUR CITY LEADERS OFFERED NOTHING AS AN OPTION FOR US TO CORRECT THIS AND MOVE FORWARD. THEY FINALLY ADMIT THE SHUT DOWN WAS INITIATED BY ENCHANTED OAKS and THAT, YES, THEY OVER RIDE SAFEBUILT". Ed asks why we have a third party if they are going to over ride them?? No answer. WE END THE HEARING BY SAYING, " WELL WE COMPLETLEY DISAGREE, WHAT DO WE DO IF WE DISAGREE? WE HAVE NOT EXCEEDED THE SCOPE."
SAFEBUILT REP IS DISTRAUGHT IN REFEREERING AN ARGUMENT AND SAYS " I DEFAULT TO YOU, IT'S YOUR CITY."
JUDY SAYS, " STOP ORDER, THEY NEED TO REAPPLY FOR A NEW PERMIT AND START ALL OVER."
SAFEBUILT BART MAKES SURE TO THEN TELL US THAT THEY DO NOT GET PAID BY THE HOUR, IT'S A SET FEE FOR EACH.
< loud and clear Bart>
PLEASE LISTEN TO OUR AUDIO OF ZOOM HEARING
I AM SO GLAD WE THOUGHT TO RECORD THAT as the CITY HAS IGNORED OUR PUBLIC REQUEST FOR THE CERTIFIED MINUTES FROM THAT HEARING.
LISTEN FOR YOURSELF.
We are incredibly distraught and feel we have been arbitrarily stopped by someone unfamiliar with the project, who has no construction knowledge and is whimsically swooping in 3 weeks into a build that she is across the street from. WHAT IS TO STOP THIS SORT OF ISSUANCE AND RETRACTION AGAIN??
WE SPEAK TO NEIGHBORS AND FRIENDS IN FRUSTRATION.
We hear other stories of arbitrary and unqualified interference. This really confuses us.
We go to a City Council meeting in August to get a gauge of what is going on. We witness Kim Cochran making childish faces of mockery towards a man in the audience who is nicely dressed and is filming the entire meeting. We don't know the guy filming, we only know Kim as she has a name plaque.
It is only after the next day, we wake up to graffiti on the home calling out an assault on 6/30 and that Kim Cochran should be recalled that we really start hearing from neighbors. We are very disappointed with everything we are hearing and how our timing is amidst what looks like some political power struggle.
This home is now an eyesore and is being held up unnecessarily from completion.
ANYONE WHO WISHES to have a copy of video of July council meeting where Judy appoints Kim and explains her limited capacity, or an audio copy of our zoom hearing where Judy demands that we stop entirely and start all over with a new permit as a new build and Safebuilt defaults to her decision, we are happy to email copies of either.

July 29, 2026 Image of 190 Enchanted
This is what it looks like when the newly appointed Asst. Building Official signs a stop order on the Building Official, Tim Johnson's permit file on our home. Tim was neither informed or consulted as to extent of the claimed exceeding of scope etc.

This permit application clearly states general scope of project. It is stamped reviewed by Safebuilt.


JUNE 19, 2026

.


"Exceeding scope" with no specific measurement of scope identified whatsoever.